. Projects in Progress
1. Campus Underground Electric System Replacement
2. Performance Contract for Energy Savings
3. LED lighting replacement at Front Entrance of Campus and Columns. Consist of (8) individual fixtures, 6 at main gate and 2 at columns. To be completed by Homecoming October 24th.
4. A.A. Fredericks ADA Sidewalk Replacement
5. Kyser Hall HVAC (TV Studio & 1st Floor Air Handlers)
6. Replacement of pumps and swimming pool renovations at Recreation Complex.
7. Construction of Media Building @ NSU Soccer Complex.
8. Kyser Hall Scholar’s College Lab Renovation (Rm. 132)
9. Watson Library Boiler Replacement
10. Watson Library Air Handler Replacement
11. NSU Shreveport Chiller & Controls Replacement
12. Athletic Fieldhouse Boiler Replacement
13. Roy Hall HVAC Replacement (Server Rm.)
14. St. Denis Hall HVAC Replacement (Telecom Rm.)