Home » Campus Projects » Future Projects
. Future Projects
A. East Caspari Hall Renovation
B. Replacement of Warrington Hall Roof
C. Creation of Parking Lots for NSU Shreveport Campus
D. NSU Shreveport Disaster Recovery Center
E. Re-Carpet Orville Hanchey Art Gallery
F. Re-Carpet Magale Recital Hall
G. Re-Carpet CAPA
H. Re-Carpet NSU Shreveport
I. Emergency Generator for NSU Shreveport Campus
J. Emergency Generator for Physical Plant Operations
K. Emergency Generator for University Police
L. Campus Fiber Optics Upgrade / LON I
M. Varnado Hall Waterproofing / Cleaning Project
N. Varnado Hall Renovation
O. Alumni Center Waterproofing
P. Alumni Center Foundation Repair
Q. Health & Human Performance Bldg. Classroom/Locker Room Renovation
R. Health & Human Performance Hot Water Line Repair
S. Re-Key Natchitoches, Leesville and Shreveport Campuses
T. Roof repairs for Fournet Hall
U. Renovation of Fournet Hall
V. Renovation of Bienvenu Hall
W. Replacement of Chilled Water Loop System
X. Additional Chiller of Warren Easton Chiller Station
Y. Upgrade of Building Management System
Z. Upgrade of Physical Plant Work Order System
AA. Renovation of Infirmary Bldg for University Police
BB. Renovation of Dodd Hall for Small Business Development Center
CC. Mechanical Renovation of Kyser Hall
DD. Electrical Renovation of Kyser Hall
EE. Resurfacing of Prather Coliseum Parking Lot
FF. Resurfacing and Base Repair for South Jefferson Street (Phase II) farm
GG. Abatement of Watson Library
HH. Re-Carpeting Watson Library
II. Re-Appolstering of furniture at Watson Library
JJ. Student Union Drainage Issues
KK. Turpin Stadium Safety Railing (Roof)
LL. Construction of Covered Walk-way in Leesville
MM. Re-Roof Bldg. A & B in Leesville Campus
NN. Construction of Pavilion for restrooms at Brown Stroud Field
OO. Construction of Weight Training Facility
PP. Construction of Women’s Field House
QQ. Renovations for Roy Hall
RR. Renovations for Warrington Hall
SS. Demolition and Replacement of Nesom Natatorium
TT. Elevator Upgrades for Natchitoches, Shreveport Campuses
UU. Waterproofing of Historical Bldg for Shreveport Campus
VV. ADA for Natchitoches, Leesville and Shreveport Campuses
WW. Phase II of Campus Fencing Project
XX. Additional Music Rooms at CAPA
YY. Normal Hill Landscaping Project
ZZ. Expansion of Normal Hill Historic District
AAA. Replacement of Street signs, and way finding signs for 911 compliance
BBB. Campus wide traffic study